| 1 | e3dms04228.JPG |
trial mock up to see how things will fit and determine the exact position of the turntable. | Add the Betriebswerk (engine yard) | (2915) |
| 2 | e2dms04218.JPG |
the last big sheet of plywood has been cut and put in place. I only have 2 screws holding it in place until I know exactlye where to cut the hole for the turntable. | Add the Betriebswerk (engine yard) | (2014) |
| 3 | dms04161.JPG |
there will be another sheet of plywood to the right... | Add the Betriebswerk (engine yard) | (1526) |
| 4 | dms04160.JPG |
part of the yard is now screwed in place. Temporary track laid. | Add the Betriebswerk (engine yard) | (1308) |
| 5 | dms04042.JPG |
laser line aids track layout | Using a laser to lay tracks! | (1290) |
| 6 | dms04032.JPG |
housing is back on, loco is tested and runs fine. | Installing a digital decoder into a 3048 steamer | (1155) |
| 7 | dms03860.JPG |
S-Bahn station ticket machines | S-Bahn model (Wilsnack station) | (1149) |
| 8 | dms04038.JPG |
I can see exactly where that track will end up | Using a laser to lay tracks! | (1097) |
| 9 | dms03812.JPG |
S-Bahn station | S-Bahn model (Wilsnack station) | (818) |
| 10 | dms03853.JPG |
S-Bahn station with ICE | S-Bahn model (Wilsnack station) | (815) |